Originally Posted by
mattyboy
not sure as of yet
So back in 64 how long did it take to develop the film, get the typeset and logo letterhead all into a magazine or newspaper flat with pics?
That would not take long. Maximum two weeks to accomplish this end to end. It was not like they needed the photo in hand to start to write copy. They would know what physical size the photo would be in advance, and then just plug it in to the layout and ship it to Motorboating by November 1, for the magazines December issue.
At the absolute earliest, figure the photo shoot and copy would have been done between October 1, and October 15, 1964 then mailed off to the folks at the Magazine.
1972 16 OB - C16B-63 - "Surface Tension" Resto Project
1974 16 OB - DMR16106017-B - "The Mule"