Just need to drop the motor back in.
I wasnt going to install a floor but now that it's done I'm glad. Matt also made the battery box out of Starboard. It will go next to the trim pump.
Sure makes it easier to work in there.
Trim will be installed on the edge as soon as I get the mounts installed.
Getting closer......