PDA

View Full Version : Mechanics of BP disaster



gcarter
05-03-2010, 07:45 AM
[/URL][URL="http://www.upstreamonline.com/live/article213922.ece"] http://www.upstreamonline.com/live/article213922.ece (http://www.upstreamonline.com/;jsessionid=BE3B435C6331712F0E26A187142F7088.upstr eam.lempira)
Race for relief well to stop blowout (http://www.upstreamonline.com/hardcopy/news/article213643.ece)Operator BP and drilling contractor Transocean were racing to spud a relief well in the middle 
of the week to intercept the Macondo wellbore and kill the blowout that is leaking an 
estimated 1000 barrels per day 
of crude into the Gulf of Mexico 
after last week’s Deep­water 
Horizon blowout.





http://www.upstreamonline.com/multimedia/archive/00034/P1000458__Medium__34459b.jpg Lateral thinking: BP senior vice president Angola offshore exploration Bob Fryar (left) and drilling & completion operations manager Charlie Holt refer to models of the LMRP and BOP stack during a press briefing at BP's crisis centre in west Houston late yesterday

related stories

Third rig on way to Macondo (http://www.upstreamonline.com/live/article213921.ece)
Bad weather delays relief well spud (http://www.upstreamonline.com/live/article213920.ece)
BOP failure a puzzle for engineers (http://www.upstreamonline.com/hardcopy/news/article213642.ece)
Slick shuts in two Gulf platforms (http://www.upstreamonline.com/live/article213899.ece)
Congress calls Halliburton on Macondo (http://www.upstreamonline.com/live/article213912.ece)
Macondo slugs players' shares (http://www.upstreamonline.com/live/article213867.ece)
BP response branded 'inadequate' (http://www.upstreamonline.com/live/article213877.ece)
All eyes on Macondo slick (http://www.upstreamonline.com/live/article213710.ece)
Macondo well slick fire plan (http://www.upstreamonline.com/hardcopy/news/article213698.ece)
Clouds hanging over industry at OTC (http://www.upstreamonline.com/hardcopy/comment/article213695.ece)
Explosion left little time to evacuate (http://www.upstreamonline.com/hardcopy/news/article213640.ece)
Drama at sea for rig’s crew (http://www.upstreamonline.com/hardcopy/news/article213639.ece)
Macondo still in BP’s future plans (http://www.upstreamonline.com/hardcopy/news/article213637.ece)

“ Every time we think we're almost at the end of our options, our engineers keep coming up with new alternatives - BP communications boss John Curry ”

BP plans to use second BOP to halt well

Third rig on way to Macondo
BP said it is expanding efforts to cap the Macondo well that is gushing an estimated 5000 barrels of oil per day into the US Gulf of Mexico, including a plan to stack an additional blowout preventer (BOP) on the bore.
Anthony Guegel, Noah Brenner & Anthea Pitt ("") 03 May 2010 00:54 GMT
The company is also investigating installing a valve on the end of the ruptured drill pipe to shut off oil leaking from there.
In addition, the UK supermajor has mobilised a third drilling vessel (http://www.upstreamonline.com/live/article213921.ece), the Transocean semi-submersible rig Development Driller II, to spud a second relief well.
"Every time we think we're almost at the end of our options, our engineers keep coming up with new alternatives," BP communications boss John Curry told UpstreamOnline.
"We're not going to quit, that's for sure. We want to get that well stopped and we want to clear that mess up. We'll be judged on how we do that."
The new efforts, which were unveiled during a press conference late yesterday at BP's response headquarters in Houston, are in addition to existing techniques to stem the flow of oil - such as trying to shut the well with the existing BOP and spudding a relief well with the Development Driller III, which is on location.

Pressure
BP is looking at installing a new BOP on top of the existing well, which could then be used to shut the well, BP executive Bob Fryar said.
Fryar normally heads BP offshore exploration operations in Angola.
Sometime in the next three days, BP will try to install a meter to gauge the pressure on the lower marine riser package (LMRP), which sits on top of the existing BOP, to see if it might be possible to install a new BOP on top.
If pressures are not too high, Fryar said crews could shear off the broken riser and LMRP unit and then "stab" or stack a second BOP unit on top of the original BOP.
The new BOP is already on board the Transocean drillship Discoverer Enterprise, which is believed to be on location.
However, if it does not work it could cause the flow from the well to increase by eliminating the back pressure created by the crimped riser.
Even if the pressure is too high to install a second BOP, the information may help BP make better estimates on the amount of oil coming from the well.
Fryar stood by BP's assertion that the best estimate for the flow is 5000 bpd, but said he also reiterated that the figure had a wide margin of error.

Trigger

Meanwhile, BP will continue trying to close the well with the BOP that is already in place on the sea floor.
It has been one of the main focuses of BP's efforts since the initial blowout and will remain so, no matter how unlikely it is to work, Fryar said, because it offers the quickest way to stem the flow.
Charlie Holt, who heads BP drilling and completions operations in the US Gulf, said BP has repaired some leaks in the hydraulic systems of the BOP.
Since then, BP has been able to trigger all of the six rams that should shear the drill string and casing and close the well, but they did not stem the flow.
Holt said some of the rubber portions of the BOP may have been eroded by sand in the flowback and may not be able to shut the well anymore.
If the second BOP can be added to the well, it may be possible to circulate fluid through that to kill the well, but BP continues with plans to drill a pair of relief wells.

Intercept
Fryar confirmed that the Transocean Development Driller III will spud the first relief well (http://www.upstreamonline.com/live/article213920.ece) as soon as the weather allows.
Currently a line of storms is moving through the Gulf, killing efforts to begin the well and slowing the effort to attack the spill.
The well, which is expected to take 60 days to 90 days to drill, will try to intercept the Macondo well bore near its total depth of about 18,000 feet.
Holt said BP believes it has to intervene at the bottom of the reservoir and could not penetrate the bore closer to the surface, which would be quicker.
Development Driller II will get on location in 10 to 12 days and will "race" to spud a second relief bore.
Fryar said both rigs were needed in case one ran into problems while drilling and to ensure a relief well is drilled as quickly as possible.
Development Driller II is currently working to secure a well on other BP acreage in the Gulf before setting sail for Macondo.
Meanwhile, BP will try within 24 hours to install a valve on the damaged drill pipe that will allow it to shut in flows coming out of the pipe.
Crews have already sheared the jagged end of the pipe so that there is a smooth cut to attach the valve.
The pipe, which extends beyond the end of the broken riser, is one of three leaks the company has identified.
Though the largest leak by far is at the end of the riser itself, BP said installing the valve on the drilling pipe reduce some of the flow of oil from the well.

Cofferdam
While this flow might be redirected to the main leak at the end of the riser, BP said it hoped to capture much of this oil in a massive cofferdam (http://www.upstreamonline.com/multimedia/archive/00034/Fabrication_work_on__34455a.jpg) being rush fabricated for the purpose.
The first of the three giant containment domes, measuring 14 feet by 24 feet by 40 feet, has been completed at a yard in Louisiana and is ready to load onto a work boat.
Fryar said it could be "deployed and in service" over top of the main leak in the next six to eight days.
Once in place, oily water would be trapped under the dome and will be pumped to the Discoverer Enterprise.
Once on board it would be processed and loaded onto a tanker to be brought to shore.
The pipework connections linking the cofferdam to Discoverer Enterprise have been finished.
Work continues on two more cofferdams, one of which is set to go over a smaller leak at the juncture of the riser and the LMRP.
A similar system worked in the shallow water US Gulf after hurricanes damaged production installations but it has never been tested at this water depth, Fryar said.
Fryar also said BP successfully tested a plan to apply dispersant to the oil as it exits the riser two days ago.
Over a six-hour test, BP sprayed about 3000 gallons of dispersant using 2-inch coil tubing connected to a wand.
The dispersants break the oil into smaller portions and allow it to naturally degrade more quickly.

Disaster
Fryar said BP was pleased with the results but that it would take some time before changes in the volume of oil on the surface were noticeable.
BP has been give federal approval to continue the practice and began applying subsea dispersants again today.
The company now plans to try to drill into the riser and directly inject dispersant into the oil stream before it shoots into the water.
The direct injection would ensure that more dispersant comes in contact with the oil and would give the substances a chance to fully mix before being diluted by water.
Fryar said BP hopes to try the direct injection sometime "over the next several days".
BP unveiled the new strategies as US President Barack Obama visited Lousiana (http://www.upstreamonline.com/live/article213926.ece) to inspect efforts to contain and clean up the massive oil slock from the well. Obama reitereated that BP was responsible for the disaster and would be expected to foot the bill for the cleanup.
Today, Reuters, quoting US media reports, cited Hayward as saying the company is "absolutely responsible" for cleanup of the oil spill.
Hayward said BP is ready to pay all legitimate claims relating to the oil spill.
"We've made it clear that where legitimate claims are made, we will be good for them," he said.
"We have the claims process set up, small claims today that are being paid instantly ... bigger claims we clearly have a process to run through."
Upstream's full coverage of the disaster is available in the related stories section, to the left of this story.

Published: 03 May 2010 00:54 GMT | Last updated: 03 May 2010 12:13 GMT

Jraysray
05-03-2010, 09:46 AM
I hope this attaches. Very interesting.

Conquistador_del_mar
05-03-2010, 12:52 PM
Probably just BS, but an interesting read. Bill

http://www.whatdoesitmean.com/index1367.htm

yeller
05-04-2010, 02:05 AM
I read somewhere it was 5000 barrels a day. :eek: