gcarter
01-30-2006, 03:21 PM
Well, we've been moving our business (seven days a week for about three weeks). The Minx is now at her new storage corner.
I'm taking advantage of the break to do some more major work.
1) replace cable steering with hydraulic (thanks Blackhawk)
2) replace exhaust tips with Gil mufflers (thanks Don Tamm)
3) pull the boat off the trailer and refinish the bottom (thanks for the use of the dollies MadPoodle)
For sure by the end of February I'll have it finished and back on the trailer.
We love our new office. We went from 1500 sq ft to 3800 sq ft. The office space went from 600' to 1200'. The old place was getting to the point where it was almost impossible to do business there. Also the boat is directly behind the office space so all I have to do is walk out the back of the break room and there it is. Things don't get much better. :biggrin:
I'm taking advantage of the break to do some more major work.
1) replace cable steering with hydraulic (thanks Blackhawk)
2) replace exhaust tips with Gil mufflers (thanks Don Tamm)
3) pull the boat off the trailer and refinish the bottom (thanks for the use of the dollies MadPoodle)
For sure by the end of February I'll have it finished and back on the trailer.
We love our new office. We went from 1500 sq ft to 3800 sq ft. The office space went from 600' to 1200'. The old place was getting to the point where it was almost impossible to do business there. Also the boat is directly behind the office space so all I have to do is walk out the back of the break room and there it is. Things don't get much better. :biggrin: